Thursday, July 29, 2010

Day 68

Another day of nothing! No contractor...called about 7:00 tonight to say he was still sick. :-(

Tuesday, July 27, 2010

Day 67

I called the contractor's friend's phone bright and early this morning. I left a message asking him to at least tell me he's not coming back. At 8:50 AM, the friend called back and said the contractor was on the way. Mom went by the house and she unlocked it. She stopped by at 10 AM and 11:30 AM and he still wasn't there. I ran by on my lunch break at 1:15 PM to "brag" on my tile to Tess and he still wasn't there; however, when I pulled in the driveway at 5:15 PM, he was there. He said he had been there for hours. What two, maybe? LOL! I told him I needed everything completed by no later than Friday morning. He said that would be fine and he would be there bright and early tomorrow morning. Mmmmmkay...let's just hope?! I had made a couple of calls earlier today and I'm trying to go ahead and line up someone else as I sadly have no faith in him at this point.

Here is a picture of my tiled bathroom floor for you to oooh and aaaah over. I'll be more than happy to refer this guy to anyone that needs any tiles laid. He was there when he said he would be there (if not earlier) and the tiles look fabulicious - especially considering my humpty-dumpty floor.

And I'll leave you with a picture of my proud little gardener...check out his pepper plant!

Day 66

The tile guy called me right before lunch today. His job was wrapping up early and he wanted to go ahead and get started on the grout. I took my lunch break to take over the grout and ten gallons of water for wiping the tile down. I came back a little after 5:00 and he was done. Man, it looks purdy! I'll post a picture tomorrow when the grout dries as it still looks dark from being wet. I'm really glad I went ahead and bought the tile versus the vinyl - I think it will be a good investment!

I did get a second quote on the floors today that looks to be a little cheaper, so that was a big plus!

The contractor had told the tile guy he would be there, but he never showed. I left a message on his friend's phone, but did not hear back from him. :-(

Sunday, July 25, 2010

Day 65

My phone rang at 9:05 this morning...it was the contractor. He said the tile guy was at my house ready to work and he would be there shortly. While I was thrilled, it would have been nice to have had some notice. I filled up four gallon jugs, took a speed shower and headed over there. The tile guy was there and setting up his tools outside. I learned that he had not been able to reach the contractor yesterday, so he rang his phone off of the hook until he answered this morning. Stop it - I know you're surprised. Anyway, he got started, so I left to take Lori to OutBack for her birthday lunch. When I got back, he was already finished with part one. The tile looks really nice and professional - very evenly spaced and flush which is a miracle on my old floor that was made up of several different materials. He also made a call to someone who does floors and he will be there tomorrow to give me a quote. I've already got one quote, but I want to shop around a little. He will be back tomorrow evening to grout the tile and I've got to collect some more jugs because he washes the tile down several times.

YAY...some progress!

PS - The contractor never showed up.

Day 64

I called the contractor's friend's phone at 8:30 tonight to see where the h#ll he was at. He was with his friend, so I got to talk to him. He started by saying he hadn't heard from the tile guy which really has nothing to do with the work he has to do under the house and I told him that. He spouted off some more lame excuses, so I hung up frustrated because I was afraid of what I was going to say. Unfortunately, the contractor is my cousin so I've tried to tread carefully, but enough is enough. I made the BIG mistake of fronting him some money thinking surely he wouldn't rip off family. Out of the last eleven days, he has worked part of four days. Stupid me...lesson learned! The tools are going straight to the pawn shop Monday to get some of my money back.

Fool me once, shame on you. Fool me twice, I'll just kick your a$s.

Saturday, July 24, 2010

Day 63

I woke up at 2:10 AM still boiling with rage over the contractor and never went back to sleep. Then, Colton woke up with pink eye. Today was his last day at summer care and he was really looking forward to going. The doctor gave him the eye drops and he should be fine a couple of days. Here's to hoping no one else gets it!

The contractor called this evening and said he had been sick with a virus for two days. He also said the tile guy should be here Saturday evening. I guess I'll hold off on taking all of his tools to the pawn shop to see what happens this weekend. hehe

With all of this, I have no plans for the weekend other than trying to let my blood pressure go back to normal after this week! I'm tired....

Thursday, July 22, 2010

Day 62

I am very frustrated. No contractor and not even a phone call today. ARRRGHHHH!!!

I feel like I've done everything I can to push this along. Many of my lunch breaks are spent chasing things down to avoid taking time off since we have been short-handed since the end of April. There is not a spare moment even though I work with one of the best co-workers and friends in the world, Tess. Just trying to keep up there is maddening and then leaving each evening to go work on the house...it's a furious pace!

Speaking of furious...I am trying to calm down this evening. Maybe the contractor has a good reason for not showing/calling today. And maybe my butt is small and flat.

I really need the bathroom done by next Wednesday so I can get the paint sprayer that weekend. Then, I could get the floors done and finally be ready to move in.

Big FAT sigh...very discouraged.

I do want to wish my little sister a GREAT BIG HAPPY BIRTHDAY today! I'm very thankful she hasn't kicked me out yet, so that I can finish the house before moving in. Love ya! Hopefully, the way cool gift Colton picked out for her will make up for it (tehe). AND remember, Lolo, if you don't have it sitting on your kitchen table at all times, it will hurt his feelings (snicker).

Day 61

The contractor had pipes burst under his home on Tuesday night, so he did not do any work today. I did meet him at Lowe's after work and pick up just about everything else needed to do the job - ching-ching! He should be back on the job on Thursday. I hope...I'm a little concerned.

Anyway, I met with the tile guy tonight who gave me a really sweet price and will do the job no later than Saturday. He has to lay the tile, wait 24 hours, then grout it. Then you can't walk on it for 48 more hours. That will slow the process down considerably.

That's all...

Tuesday, July 20, 2010

Day 60

Still chugging along on the bathroom. The contractor had almost finished the backerboard yesterday. This morning, he said he noticed something was off and had to pull it back out. Whomever had installed the handicapped shower had cut straight through one of the floor joists, so the floor was sagging in the middle. He spent a good part of the day repairing that and then put the backer board back down. It's nice and level now, but this meant that the tiler couldn't come today, so it will be tomorrow. I'm just happy he caught it and it will be done right.

G'Night!

Monday, July 19, 2010

Day 59

Whew...where do I start?! I guess I'll start by saying some of Daddy's work had to come back out. It's just kinda cuckoo-crazy, so I'm not going to go into the details (bless his heart). I now have some of the drywall back up and the window properly sealed (that was covered up). The backer-board for the tile is practically done. I agonized over the tile color at lunch today. I know white/off-white is the standard, but there was some really pretty brown tile that I really loved; however, I was afraid that it might be too trendy of a look and be outdated in a year or two. Plus, my cheap butt found some 'Sahara Beige' ceramic tile on clearance, so that settled it. All of the cast iron pipes are removed from the bathroom and ready for the new stuff to go in. I would lay out a schedule of what's going to happen next, but I know you're tired of my big fat lies since nothing ever goes as planned.

*****IMPORTANT NEWS FLASH*****
Guess what the heck is missing from my house.

I said GUESS!

Give up?

The stinky-moldy-mildew smell! It's gone! Mom and I had decided last week that the smell was coming from underneath the kitchen sink. There was a small leak, so Mom had cleaned and bleached the cabinet which seem to help a tiny bit. Still wondering if it was the crawl space underneath the sink, I asked the contractor if he would roll out the Visqueen for me. He made me look in the crawl space, so I stuck my head in. All of probably about one sixteenth of an inch. Enough to see that it was drier than the desert under there. The dirt is almost powder it is so dry; however, he said that my kitchen sink drain pipe had fell and was letting water sit down in line. When he took it apart, the smell was unbearable. Now that the water has been off for a couple of days and the drain line is dry, I have no stinky smell. He will repair the pipes when he puts everything back together. I AM A HAPPY GIRL! This also means everyone can stop avoiding eye contact with me when I mention someone helping me crawl under the house. LOL!!!

One other positive note, my mailbox brought sweet relief today. My tax refund for buying a new home came today. Of course, the bulk of it went right back to repay my down payment, but I'll use the rest to pay for the bathroom and floors and pay off what I've charged up so far. Can I just say? I don't care if you are Republican, Democrat or think Ross Parole should run again (tehe), this program was a wonderful blessing for people like me. Alot of families know they can make those monthly payments, but the initial down payment is hard to come up with.

I have to admit that it's been really nice to take it easy for a few days. After being so sick last week and falling on my booty, I figured I needed to slow down a little. I've "supervised" while the contractor has taken care all of the hard stuff. Here's to hoping things keep flowing along the rest of the week...cheers!